Bu Haseer Early Production Scheme - EPS
UAE

The project scope is the construction work in brownfield that includes civil, piping, E&I (33KV cable), structural steel and painting in addition to precommissioning activities.

The client is National Petroleum Construction Company (NPCC) / CCEL.

The contract was awarded on 19 December 2016.

The project start was 19 December 2016 for a duration of approximately sixteen months ending in April 2018.

Design and Construction of Al Bustan Street North (P007 C7 P2)
Qatar

The scope of work includes the complete design, approvals, permitting and construction of a new expressway, including four grade-separated interchanges with cross roads, frontage roads, overpass and underpass structures, retaining walls, pedestrian and bicycle paths, traffic signs, signals and ITS, landscape, hardscape, artscape, street lighting, surface water micro-tunnel and all related infrastructure.

The client is the Public Works Authorities (Ashghal).

The consultant is Parsons.

The contract was awarded on 20 March 2017.

The project start was 20 March 2017 for a duration of approximately 41 months ending in August 2020.

Mall of Oman Package 2 Main Works
Oman

The Mall of Oman is a three-level shopping centre with a total leasable area of 144,700m2. The building includes 350 retail units, a hypermarket, a children’s entertainment zone, a snow park, a mix of underground and on grade car park and all associated external and infrastructure works. The total built up area is 387,193m2.

The client is Majid Al Futtaim Properties (Oman) LLC. The contract administrator is AECOM. The engineering consultants are Parsons / Infracad.

The project is a joint venture with Shapoorji Pallonji Mideast LLC (SP) (50/50).

The contract was awarded on 7 February 2017.

The project start was 8 February 2017 for a duration of 37 months ending on 5 March 2020.

Saudi-Bahrain Pipeline Project Offshore EP and Installation, Al Qurayyah
Saudi Arabia

Provision of manpower and equipment to perform onshore works at Qurayyah. The works include mobilization, construction of pipeline trench, installation of new 30" U/G and A/G pipeline segment, assistance for pipeline hydrotesting and precommissioning, assistance for pipeline and cable shore pull at Qurayyah, construction of thrust anchor, installation and maintenance of dewatering system, installation and testing new onshore fibre optic cable, installation of temporary CP system and complete ICCP system and fencing with security gates for dedicated CP area.

The client is National Petroleum Construction Co. (Saudi) Ltd. (NPCC) and the Owner is Saudi Aramco.

The contract was awarded on 5 January 2017.

The project start was 1 March 2017 for a duration of six months ending on 30 August 2017.

The Construction of Kalabo-Sikongo-Angola-Bodergate Road
Zambia

Construction of an 85km single carriageway road with asphalt surfacing. The works include earthworks, layer works, chemically stabilized subbase, crushed stone base, asphalt surfacing, culverts, ancillary works and one bridge (75m, 3 span) at Sikongo.

The client is the Roads Development Agency.

The consultants are Wanjohi Consulting Engineers, Kenya, and Industrial & Engineering Consulting Office (INCO), Kuwait

The contract was awarded on 12 December 2016.

The project start was 12 January 2017 for a duration of about 27 months ending on 30 March 2019.

Construction of Gaborone to Boatle to Dual Carriageway Standard
Botswana

The scope includes upgrading the existing 18.4km long Gaborone to Boatle Road to dual carriageway standard including construction of two bridges, a grade separated interchange with overbridge, culverts, kerbstone, roadbed, earthworks, lower and upper SSG, stabilized subbase, crushed base course, asphalt surfacing, street lighting, traffic light and road signs.

The client is the Ministry of Transport and Communications.

The consultant is Bothakga Burrow Botswana Pty Ltd.

The contract was awarded on 10 February 2017.

The project start was 24 March 2017 for a duration of two years ending on 23 March 2019.