Botswana
Botswana
Egypt
Ethiopia
Mauritania
Morocco
Namibia
Nigeria
Tanzania
Algeria Cordinates
Close Algeria

Algeria Algeria Flag

Forum El-Djazair, Zone 1 - Residential Buildings

Construction of 4 residential high rise buildings (124 apartments), each comprising 3 basements, ground, mezzanine and 22 floors and terrace.

Built-up area - 211,960m2.

Client

Société Algéro-Emiratie de Promotion Immobilière (EMIRAL)

Start / End

November 2011 / May 2014

Botswana Cordinates
Close Botswana

Botswana Botswana Flag

Upgrading Gaborone - Molepolole Road from Western Bypass to Metsimothabe

Upgrading 13.7km to dual cariageway (3 lanes & 2 lanes) including relocation of services, drainage, crusher, run base, premix, surfacing, and all associated road furniture.

Client

Ministry of Works & Transport Roads Department

Start / End

October 2008 / June 2012

Egypt Cordinates
Close Egypt

Egypt Egypt Flag

  • P.1
  • P.2
  • P.3
  • P.4

Nile Corniche Towers (St. Regis Hotel), Cairo

197,324m2 mixed-use development built-up area located on a 9,360m2 site.

Phase 1: Phase 1A - Early enabling and off-site coordination and engineering works.

Phase 2: Construction of 2 towers, 29 floors (131m high), and 30 floors (135m high) above ground and sitting on a 7 storey podium, underground services and parking.

Client

Qatari Diar Real Estate Investments, Egypt (LLC)

Start / End

September 2009 / April 2014

Sharm El Sheikh Project

Design-Build contract, total area - 335,000m2

5-star luxury resort hotel: bungalows, furnished apartments, retail and entertainment facilities.

Client

Qatari Diar Real Estate & Tourism Investment Co., Egypt LLC

Start / End

September 2009 / October 2013

Saudi Embassy in Cairo, Chancellery, Consulate & Staff Residence

Construction of a 24 storey office tower 84m high and a 17 storey residential tower 60m high. Total built-up area of 35,000m2.

Client

Saudi Ministry of Foreign Affairs

Start / End

February 2006 / January 2012

Ain El Sokhna Supercritical Thermal Power Plant, Units 1 & 2, 2 x 65 MW Gas/Oil Fired Units

Design, fabrication, furnishing, delivery to site, storing, installing, testing, start-up, commissioning, electrical and mechanical works, associated systems and equipment including instrumentation and controls, and maintainance until Taking Over and Acceptance Certificate (TOAC), all civil, architectural, etc.

Scope includes site development, underground utilities, power generating facilities, auxiliary facilities, electrical works, and miscellaneous works.

Client

East Delta Electricity Production Company (EDEPC)

Start / End

April 2010 / April 2014

Ethiopia Cordinates
Close Ethiopia

Ethiopia Ethiopia Flag

Gore - Gambela Road Upgrading Project

Upgrading of existing gravel surfaced road to asphalted road. Asphalt concrete surface up to 94km and double surface bituminous road up to 144km. The road will have a 6.7m carriageway and shoulders of 1.5m in rural sections and 13.7m in town sections. Construction of 9 river bridges.

Client

Ethiopian Roads Authority

Start / End

March 2007 / May 2012

Mauritania Cordinates
Close Mauritania

Mauritania Mauritania Flag

  • P.1
  • P.2

Atar - Tidjikja Road, Lots 1 & 2

205km asphalt road, 7m wide, with box culverts and Irish crossings.

Client

Ministry of Equipment & Transport

Start / End

August 2011 / March 2015

Tasisast General Contract - Process Plant

Construction of ore process facilities together with relevant utilities including civil, structural, piping fabrication and erection, equipment erection, and E/I works.

Client

Tasiast mauritanie Ltd. S.A. / Kinross

Start / End

November 2011 / December 2013

Morocco Cordinates
Close Morocco

Morocco Morocco Flag

Sheikh Khalifa Bin Zayed Al Nahyan Specialized Medical Centre in Casablanca - Main Works

Construction of a hospital with a total built-up area of 41,037m2.

Client

Khalifa Bin Zayed Al Nahyan Foundation

Start / End

September 2011 / November 2013

Namibia Cordinates
Close Namibia

Namibia Namibia Flag

Upgrading of Trunk Road 15, Section 1 between Tsumeb & Katwitwi Tsumeb & Katwitwi, Section B - Km 70 to Km 140 on TR 15/1

Construction and maintenance for one year of a 70km road.

Client

Roads Authority

Start / End

October 2009 / April 2012

Nigeria Cordinates
Close Nigeria

Nigeria Nigeria Flag

  • P.1
  • P.2
  • P.3
  • P.4
  • P.5
  • P.6

Rehabilitation of Enugu Bound Carriageway of the Onitsha - Enugu Road (Phase 1 of Section 1) in Anambra State

Rehabilitation of a 52km carriageway, extension of culverts, drains, and kerbs.

Repair of 1 bridge.

Client

Federal Ministry of Works, Housing & Urban Development

Start / End

May 2009 / November 2012

Rehabilitation of 9th Mile - Enugu - Port Harcourt Dual Carriageway in Enugu/Abia States

Reconstruction of a 70km road and repair of a 10km road.

Repairs to existing bridge.

Client

Federal Ministry of Works, Housing & Urban Development

Start / End

May 2009 / November 2012

Rehabilitation of Onitsha Bound Carriageway of the Onitsha - Enugu Road (Phase 2 of Section 1) in Anambra State

Rehabilitation of a 52km carriageway. Repairs and overlay to existing road.

Client

Federal Ministry of Works, Housing & Urban Development

Start / End

December 2009 / June 2012

Dualization of Ughelli – Asaba Road (Sector B)

Construction of a 53km new lane, rehabilitation of the existing lane, and construction of a 270m long x 11m width, 13 span bridge, 20.5m each over the Ossissa River.

Client

Ministry of Works, Asaba Delta State

Start / End

March 2009 / June 2012

Dualization of Onitsha - Owerri Road Section I & Onitsha Eastern Bypass in Anambra State

Main Road: 47km dual carriageway 7.3m wide, 2-lanes 3.65m each, and 2.75m wide shoulders on both sides.

Bypass: 8km single carriageway 7.3m wide, 2-lanes 3.65m each, and 2.75m wide shoulders on both sides.

Construction of one cast in-situ and precast bridge and 2 interchanges on the Bypass.

132.2km drainage structures, box culverts, kerbstones, road signs and markings.

Client

Federal Ministry of Works, Housing & Urban Development

Start / End

August 2006 / June 2012

Rehabilitation of Oba - Nnewi Road Section 1 in Anambra State

Reconstruction of a 20km road and repairs to a 14km existing road.

Client

Federal Ministry of Works, Housing & Urban Development

Start / End

May 2009 / May 2012

Tanzania Cordinates
Close Tanzania

Tanzania Tanzania Flag

Millenium Challenge Account, Package 3, Lot 1 - Upgrading of Tunduma-Ikana Road to Bitumen Standard

Reconstruction and upgrading of a 63.7km gravel road to bitumen standard.

Client

Millenium Challenge Account, Tanzania

Start / End

October 2010 / September 2013