Presidential Palace - Wings Package

Construction and 36 months maintenance of 3 wings for their Excellencies the President, Vice President and Crown Prince, and service tunnel.

Construction of technical buildings with a total built-up area of 28,815m2 including energy centre, general store, workshop building and water tanks.

Client

Ministry of Presidential Affairs represented by the Executive Committee for the Presidential Palace Project (ECPPP)

Start / End

March 2011 / March 2013

Presidential Palace

Site celarance of a 250,000m2 area. Construction and maintainance of 5 buildings.

Client

Ministry of Presidential Affairs

Start / End

September 2010 / March 2013

The Landmark Tower

Construction of a 329m high, 72 floor residential, office and retail tower and other associated works forming a mixed use high rise development. Works include all structures, cladding, engineering services, finishes, and fitting out.

Total built-up area of 197,000m2.

The completed development will be the second highest tower in Abu Dhabi.

Client

The Department of The President's Affairs

Start / End

March 2007 / June 2012

Expansion of Abu Dhabi International Airport, Midfield Terminal Buildings Pile Caps & Associated Works

Construction of Midfield Terminal Building pile caps, waterproofing and backfilling.

Client

Abu Dhabi Airport Co. Planning & Development

Start / End

February 2011 / February 2012

Khalifa Port & Industrial Zone - Industrial Zone Area A, Infrastructure North

Earthworks, drainage, roads, infrastructure, 3 rail bridges, mechanically stabilized earth walls, electrical power system, potable water, storm water, ground water, and wastewater network.

Client

Abu Dhabi Ports Co.

Start / End

September 2010 / March 2012

Shah Sulphur Station & Pipelines

Shipping of liquid sulphur through a dual 11km pipeline, storage of liquid sulphur, blocking, granulation, railcar loading, storage of elemental granular sulphur, conveyor and stacker/reclaimer systems, utilities, and infrastructure facilities.

Client

Abu Dhabi Gas Development Co. (Al Hosn Gas)

Start / End

May 2011 / September 2014

100 MBD Das Facilities Upgrade Project, Das Island

Main Process package comprising separators, scrubbers, stripper, crude pumps, sour charge heaters and product pumps.

Main utilities package comprising boiler, condensate bay, FG skid, dosing skid and pumps.

Demolition, relocation and tie-in to existing facilities.

Client

Abu Dhabi Marine Operating Co. (ADMA-OPCO)

Start / End

September 2011 / December 2013

Borouge III Ethylene (EU3) Plant, Ruwais

Engineering (civil) and construction of an Ethylene plant using 5,100 ton/day of Ethane feedstock and producing 1.5 MM ton/yr of Ethylene, Propylene and Hydrogen.

Client

Abu Dhabi Polymers Co. Ltd. (Borouge)

Start / End

October 2010 / May 2013

Habshan 5 Process Plant, NGL Package

Construction of 2 NGL recovery trains and one residual gas compression unit.

Civil, buildings, equipment erection, piping fabrication and erection, stell structure erection, electrical and instrumentation, painting, insulation and fire proofing works, and pre-commissioning activities.

Client

Abu Dhabi Gas Industries (GASCO)

Start / End

January 2010 / January 2013

Habshan Flare Gas Recovery

EPC of new flare and blowdown system, new distribution systems with interface and tie-ins with existing utilities and off-site facilities.

Construction of a substation and 2 compressor buildings and shelters.

Client

Abu Dhabi Gas Industries (GASCO)

Start / End

May 2009 / April 2012

Qusahwira Field 1.8 MMBOPD Project

New central degassing station 30 KBOPD, new remote degassing station, 118km 4" - 8" produced oil flow lines, 9km 20" transfer line, 7km 6" gas transfer line, 64km 3" gas injection lines, 80km 14" main oil line, 2 new water injection clusters including 5 injection wells and 8km 6" - 8" flow lines, and 57 well tie-ins.

Client

Abu Dhabi Co. for Onshore Oil Operations (ADCO)

Start / End

December 2010 / April 2013

Sahil, Asab & Shah (SAS) Full Fields Development

Construction and EPC Main Oil Lines to Asab and 8 no. buildings.

Upgrade existing CDS and 2 RDS at Shah. Upgrade existing CDS and 1 RDS at Sahil.

New 315km trunklines and flowlines 3" - 16".

107km 16" main oil line (Shah & Sahil to Asab).

Demolition of 31km of pipelines 6" - 30".

Connections to well heads at Sahil and Shah.

Client

Abu Dhabi Co. for Onshore Oil Operations (ADCO)

Start / End

January 2009 / December 2013

Bab Thammama G & Habshan 2 Development 1.88 MM BOPD Project

Fabrication and erection, laying flow lines and pipelines, EPC field erected tanks, 4 remote degassing stations and BCDS with all associated works, mechanical and E&I works.

Client

Abu Dhabi Co. for Onshore Oil Operations (ADCO)

Start / End

March 2010 / August 2012

12" Pipeline from Takreer Petrochemical Refining Plant to APC/ITM Umm Al Nar Power & Desalination Plant

3,400m 12' Pipeline, 2 meter/filter skids, 2 tie-ins, 4,000m FOC cables, DCS upgrade, civil & E/I works.

Client

Arabian Power Co. (APC/ITM)

Start / End

February 2011 / April 2012

Kuwait Cordinates
Close Kuwait

Kuwait Kuwait Flag

  • P.1
  • P.2
  • P.3
  • P.4
  • P.5

Maintenance of Installations, Roads & Minor Construction Works at Shuaiba Port

Maintenance of roads, buildings, berths, infrastructure, earthworks, demolition of building, and electrical works.

Client

Kuwait Ports Authority

Start / End

January 2009 / January 2012

Procurement & Construction Contract for Mechanical Projects & Associated Works at Shuaiba Refinery

Civil, Mechanical, HVAC, Electrical and Instrumentation works.

Client

Kuwait National Petroleum Co. (KNPC)

Start / End

November 2010 / December 2015

Two Eocene Tanks & Two Chemical Storage Tanks at Main Gathering Center

EPC 1 no. 100,000 BBL stock tank with gas boot, 1 no. 50,000 BBL free water nock-out-out tank with gas boot and 2 no. 25,000 US gallon chemical storage tanks and associated facilities.

Client

Saudi Arabian Chevron Inc. - Kuwait Gulf Oil Co. Joint Operations

Start / End

October 2011 / September 2013

Tank Maintenance at Mina Al Ahmadi Refinery

Cleaning and repair works.

Client

Kuwait National Petroleum Co. (KNPC)

Start / End

June 2009 / August 2013

New Export Transit Pipelines from BS-171 to AGRP at Mina Al Ahmadi

EPC 60km 24" dia. gas export line, 60km 14" dia. condensate export line, 15km 8" dia. pigging liquids disposal line, tie-ins with existing facilities, and 500m 8" dia. liquid condensate pipeline. Civil, E&I and mechanical works.

Client

Kuwait Oil Co.

Start / End

September 2011 / September 2013

Oman Cordinates
Close Oman

Oman Oman Flag

  • P.1
  • P.2
  • P.3
  • P.4
  • P.5
  • P.6
  • P.7
  • P.8

Muscat International Airport, Main Contract 1 Runways, Roads & Utilities

Phase 1: Construction of a 4km runway, taxiways and utilities.

Phase 2: Landside roads, interchanges, bridges and utiltiies.

Client

Ministry of Transport & Communication, Directorate General of Safety & Aviation Services

Start / End

August 2009 / April 2014

New Port at Al Duqm - Maritime Works

Construction of a 4,000m main breakwater, 5,100m lee breakwaters and 2,930m quay walls. Dredging to provide for the entrance channel (-19m), harbour basin (-18m). Construction of reveted slopes within the harbour. Reclamation works.

Client

Ministry of Transport & Communications, Directorate General of Ports & Maritime Affairs (DGPMA)

Start / End

May 2007 / May 2012

A'Seeb Collection and Conveyance System, Al Khoudh Gravity Sewer Networks - Contract 5B

Construction of 489km HDPE and UPVC gravity sewage network, manholes, cable ducts, and house connections.

Client

Haya Water

Start / End

October 2009 / November 2012

Design & Construction of Underpasses at Bait Al Barka Roundabout

Design and construction of grade-separated underpasses with approach roadways and ramps connecting to the underpasses.

Client

Muscat Municipality

Start / End

November 2011 / November 2012

Design & Construction of Grade Separated Junctions along Batinah Highway

Box girder bridge superstructures, bridge abutments, MSE walls, box culverts, drainage works, landscaping, irrigation, public utility service diversion and protection.

Client

Ministry of Transport & Communications

Start / End

October 2011 / November 2012

Third Laning of the Main Road from Mawaleh to Bait Al Baraka Roundabout (Lot 1)

Design and construction of 3rd lane (7km), 3 interchanges, 1 pedestrian bridge, 11 box culverts (total 114 cells), pipe culverts & other roadway elements.

Client

Muscat Municipality, Directorate General - Roads

Start / End

April 2010 / March 2012

Engineering & Maintenance Contract (EMC) in Bahja, Marmul & Nimr

7 year engineering and maintenance contract. Terminal facilities, infrastructure assets and government gas assets including EPC and commissioning of green and brown filed EMC projects and maintenance support.

Client

Petroleum Development Oman (PDO)

Start / End

October 2010 / October 2017

Block 3 & 4 Development Project (Phase II) - Farha & Saiwan Stations

Civil, mechanical, structural & E/I works for 3 stations and 2 no. 10" & 16" dia.crude oil pipelines.

Client

CC Energy Development (Oman Branch)

Start / End

September 2011 / February 2012

Palestine Cordinates
Close Palestine

Palestine (West Bank) Palestine Flag

Infrastructure Works for Al-Reehan, Ramallah &
Al-Jenan, Jenin Neighbourhood Housing Projects

Management, construction, testing and commissioning. Earthworks, roads and associated infrastructure works including street lighting, ground water and sewage network, storm water network, electricity and telecommunication network. Design/build wastewater treatment plant (1,350 m3/day) in Al-Reehan.

Client

Abu Dhabi Municipality

Start / End

January 2011 / April 2012

Qatar Cordinates
Close Qatar

Qatar Qatar Flag

  • P.1
  • P.2
  • P.3
  • P.4
  • P.5
  • P.6
  • P.7
  • P.8
  • P.9

Multipurpose Administration Complex Phase 1, Ras Laffan

EPC of canteen building, medical centre with helicopter landing pad and helipad pump house, central plant and 22 kV substation, external works and services. Total area of 34,820m2.

Client

Qatar Petroleum

Start / End

June 2011 / October 2013

Qatar Faculty of Islamic Studies

Supply, installation, testing, commissioning and maintenance during warranty period of faculty facilities including classrooms, auditorium, exhibition space, faculty offices, prayer areas, and underground car park.

The building consists of 2 basements and 5 floors with a total built-up area of 41,770m2.

Client

Qatar Foundation for Education, Science & Community Development

Start / End

May 2011 / May 2013

Barwa Commercial Avenue

Supply, installation, testing and commissioning of an 8km development of commercial complexes, showrooms, upper scale mall, stores and residential buildings. Total gross floor area - 910,000m2.

Client

Barwa Real Estate Co.

Start / End

February 2008 / June 2012

New Doha International Airport

  1. CP93 Main Fire Station, Satellite Fire Station & Airport Surveillance Radar Building - Package A
  2. CP95 - Administration Building Blocks A & B, Medical Center and Employee Village - Package C
  3. CP96 - General Aviation Hangar, General Aviation Terminal and Solid Waste Handling Facility - Package D

Client

New Doha Int'l. Airport (NDIA) Steering Committee

Start / End

January 2011 / April 2012

Dukhan Highway-Central Contract

EPC of a 15km 4-lane dual carriageway with a 3 grade separated interchange.

15km cycle track, 40km surfaced CD roads and relocation of electiricty, water, and telephone lines.

Client

Public Works Authority (ASHGHAL)

Start / End

April 2011 / September 2013

Doha Expressway, Package 12 (F-Ring Road)

8km 3-lane dual carriageway and 4 interchanges, infrastructure and landscaping.

Client

Public Works Authority (ASHGHAL)

Start / End

April 2011 / April 2013

Barzan Central Contract, Package 1 - Process Area (A000) & Building Works, Ras Laffan

Processing of 1.9 Billion SCFD of feed gas.

Construction of the process plant area, including piping fabrication and erection, civil works, EPC buildings, steel structure erection, equipment erection, E&I, painting, insulation and common scaffolding.

Client

Qatar Petroleum & ExxonMobil

Start / End

September 2011 / June 2014

Gas Sweetening Facilities at Mesaieed & Dukhan

Upgrade of a Sulphur recovery unit and construction of an acid gas removal plant at Dukhan to supply 450 MMSCFD sweet Khuff gas to fuel gas grid for industrial consumers. EPC concrete buildings and Jetty works at Mesaieed.

Client

Qatar Petroleum

Start / End

December 2010 / May 2013

Barzan Offshore Project - Onshore Pipeline Works

Construction of 2 x 32 gas pipeline and 4.5" MEG pipeline, 5.2km each.

Client

Ras Laffan Liquefied Natural Gas Co. (RasGas)

Start / End

Octomebr 2010 / September 2013

Saudi Arabia Cordinates
Close Saudi Arabia

Saudi Arabia Saudi Arabia Flag

  • P.1
  • P.2
  • P.3

Ras Al-Khair Power & Desalination Plant, Phase 1 – Package P, 2400 MW Combined Cycle Power Plant – Civil Works

Civil and building construction works including soil stabilization (piling/stone columns/DC), backfilling, excavation, foundations, buildings, structural steel, and roads.

Client

Saline Water Conversion Corp. (SWCC)

Start / End

May 2011 / October 2013

Ras Al-Khair Aluminum Smelter - Process Support Facilities

Civil works for an aluminum smelter with a capacity of 750,000 ton/year.

Construction of compressed air MV/LV substation, maintenance shops and warehouse building, compressor housing, elevated walkway, anode baking furnace amenities room, rodding shop amenities room, central maintenance building, and central warehouse building.

Work includes plumbing, HVAC, equipment installation and electrical, civil, architectural and temporary works. Total building area - 14,000m2.

Client

Maaden Aluminum Co.

Start / End

September 2011 / August 2012

King Abdul Aziz International Airport Development Phase 1, Jeddah - Service Corridor for Landside & Airside

Supply and installation of underground piping for chilled water, fire fighting, potable water, storm water, waste water, grey water networks, MV and LV communication duct banks.

Client

General Authority of Civil Aviation

Start / End

June 2011 / October 2013