Sustainability Report 2014 - page 25

Applied
Programs
• Solar water heating.
• PV systems to power large camps (more than 1,000 people).
• Recycled grey water used for irrigation, general cleaning &
dust control.
• Gas-fired kitchen equipment instead of electrical powered.
• Recycling & Paper reduction.
• Covering large areas of camps with natural greenery.
• LED lighting & Energy saving bulbs.
• Lighting control strategy based on occupancy sensors.
• Low flow rate sanitary fixtures, flushing valves and cisterns.
• Water-less urinals.
• Solar Assisted Air Conditioning.
• Hybrid Buses.
• Electric Pick Up Vehicles.
• Atmospheric Water Generator.
• RainWater Capture.
• Re-commissioning MEP Systems including water and air
balancing.
• Athens (Greece).
• Qusahwira Camp (UAE).
• Shah Camp (UAE).
• Muscat International Airport (Oman).
• Bab Habshan Development & Expansion of Bab Gas
Compression (UAE).
• Dukhan Highway (Qatar).
• King Abdul Aziz International Airport (Saudi Arabia).
• Barzan Onshore Project Ras Lafan Port (Qatar).
• APLNG Pipelines (Australia).
• Abu Dhabi Plaza (Kazakhstan).
• Qatar Faculty of Islamic Studies (Qatar).
• Wasit Gas Development Project (Saudi Arabia).
CCClocations
usingGreen
Solutions
PilotSchemes
25
Consolidated Contractors Group S.A.L. | Sustainability Report 2014
1...,15,16,17,18,19,20,21,22,23,24 26,27,28,29,30,31,32,33,34,35,...88
Powered by FlippingBook