ENVIRONMENT
Abu Dhabi
Plaza Mixed Development - ADP
(Kazakhstan)
GREEN CONSTRUCTION & PROJECTS
CCC and Arabtec (as a Joint Venture) are the main
contractors responsible for designing and building,
the Abu Dhabi Plaza (ADP) in Astana, Kazakhstan.
ADP is one of the iconic projects in Astana chosen
for EXPO 2017, representing a model investment
partnership between Kazakhstan and United Arab
Emirates. The project design and construction
stages target and follow LEED certification for each
building separately (see bottom right picture). As a
multi-LEED certification development project strict
design and construction systems are followed.
The main features of these systems are:
Energy
• 14-20% saving
(*)
during occupancy by:
• High efficient HVAC systems
• Optimized façade systems
• High insulated external roofs
• Low lighting power density fixtures with
occupancy sensors
• Enhanced commissioning process
• Strict measurement and verification plan
Water
• 40% saving
(**)
during occupancy by:
• Low flow and flush fixtures
Waste
• Optimized garbage collection system ensuring
effective recycling process during occupancy
Materials
• 10-20% of permanently installed material is of
recycled content
• More than 50% of the permanent wood comes
from sustainable sources (FSC certified)
Indoor Environment
• CO
2
sensors and ventilation systems for common
areas
• Low VOC content for all permanently used paints,
adhesives, etc.
Efficiency and environmental responsibility
are reflected in the entire ADP project:
from design to construction, through to
commissioning and occupancy.