Mega Reservoirs at Primary Reservoir Pumping Station (PRPS), Packages A & C CCC | Image | Decoration CCC | Image | Decoration

Mega Reservoirs at Primary Reservoir Pumping Station (PRPS), Packages A & C

The project entered the Guinness Book of Records for the Largest Drinking Water Storage Tank of its kind ever built.

Represents a groundbreaking infrastructure project designed to enhance water security and distribution in the region. Package A (PRPS-1) and Package C (PRPS-5) are integral components of this initiative, ensuring a reliable and efficient supply of water to meet the growing demands of the population. These reservoirs will significantly improve water management, reduce dependency on groundwater sources, and support sustainable development, ultimately contributing to the overall economic and social well-being of the community.

Interesting Facts

  • Each Reservoir requires 11 months to construct and 5 months to sterilize.
  • Each reservoir is circa 43,000 m2 equivalent to four Football fields next to each other.
  • Each Reservoir varies from 90,000 m3 to 124,000 m3 of concrete, equivalent to 90 to 12 double story villas.

LOCATION

Qatar

CLIENT

Qatar General Electricity & Water Corporation (KAHRAMAA)

SCOPE

Engineering, Procurement, Construction, Commissioning

COMPLETION

December 2020

436,633.45
cubic meters

Total Embankment Volume

5 Potable Water Reservoirs / Tanks

Potable Water Storage Infrastructure

Related Projects