NASR Full Development, Package 3

Onshore Modification At Das Island, Installation Of 128 MW Power Generation Facility

The project represents a strategic leap in offshore oil production for Abu Dhabi, enhancing energy infrastructure and operational efficiency. Package 3 focuses on critical onshore modifications at Das Island, including the installation of a 128 MW power generation facility to support increased crude processing capacity.

This project is a cornerstone in ADNOC’s commitment to sustainable energy expansion, integrating advanced utilities and control systems to handle the surge in production from the NASR field. The development ensures reliable energy supply, optimized processing, and enhanced environmental safety through modernized flare systems and condensate handling.

LOCATION

Abu Dhabi

CLIENT

Abu Dhabi Company for Offshore Petroleum Operations (ADNOC Offshore)

SCOPE

Engineering, Procurement, Construction

COMPLETION

January 2021

4 Gas Turbine Generators

Total Installed Capacity: 128 MW

65 MSTBOPD
(Thousand Stock Tank Barrels of Oil Per Day)

NASR Field – Annual Average Crude Oil Production Capacity