100 MBD Das Facilities Upgrade Project
This strategic upgrade significantly enhanced the oil processing infrastructure on Das Island, increasing production capacity by 100,000 barrels per day from the Lower Zakum offshore field. The project involved the modernization and expansion of critical facilities, resulting in improved operational efficiency, reliability, and throughput.
By optimizing crude oil output, the initiative plays a vital role in supporting the UAE’s energy objectives, ensuring sustained production and reinforcing the country’s position in the global energy landscape.
Impact:
- Increased production capacity by 100,000 b/d
- Enhanced processing efficiency and reliability
- Strengthened UAE’s offshore oil infrastructure
- Supported long-term energy sustainability and economic growth
LOCATION
Abu Dhabi
CLIENT
Abu Dhabi Marine Operating Company (ADMA-OPCO)
SCOPE
Engineering, Procurement, Construction, Commissioning
COMPLETION
June 2015
2 Separator Trains/
Each with a Capacity of 110,000 Barrels/Day (MBD)
Separator Capacity
Revamp of Existing Facilities:
5 Existing Separator Trains, Each with a Capacity of 70 MBD