NASR Full Development, Package 3
Onshore Modification At Das Island, Installation Of 128 MW Power Generation Facility
The project represents a strategic leap in offshore oil production for Abu Dhabi, enhancing energy infrastructure and operational efficiency. Package 3 focuses on critical onshore modifications at Das Island, including the installation of a 128 MW power generation facility to support increased crude processing capacity.
This project is a cornerstone in ADNOC’s commitment to sustainable energy expansion, integrating advanced utilities and control systems to handle the surge in production from the NASR field. The development ensures reliable energy supply, optimized processing, and enhanced environmental safety through modernized flare systems and condensate handling.
LOCATION
Abu Dhabi
CLIENT
Abu Dhabi Company for Offshore Petroleum Operations (ADNOC Offshore)
SCOPE
Engineering, Procurement, Construction
COMPLETION
January 2021
4 Gas Turbine Generators
Total Installed Capacity: 128 MW
65 MSTBOPD
(Thousand Stock Tank Barrels of Oil Per Day)
NASR Field – Annual Average Crude Oil Production Capacity