Zuluf Onshore Oil Project, General Contract Package GC1B
A key pillar of Saudi Arabia’s strategy to increase its crude oil production capacity to 13 million barrels per day (bpd) by 2027, the Zuluf Incremental Project aims to boost output by up to 600,000 bpd, nearly doubling the field’s current capacity.
This transformative initiative not only reinforces Saudi Aramco’s position as the world’s leading oil exporter, but also plays a vital role in strengthening global energy security by ensuring a stable, scalable, and long-term supply of crude oil for decades to come.
LOCATION
Saudi Arabia
CLIENT
Saudi Aramco
SCOPE
Construction, Pre-Commissioning
AWARD
April 2023
One of the Largest Oil Expansions Globally
Setting New Benchmarks in Scale and Energy Infrastructure
Building a Two-Train Gas-Oil Separation Plant (GOSP)
to Boost Processing Capacity and Operational Efficiency
Production Boost
Increasing Output from 800,000 Barrels/Day to 1.4 Million Barrels/Day