Upgrading of Mesaimeer Road

This landmark infrastructure project involves the comprehensive design and construction of peripheral road upgrades along a 4 km stretch of Mesaimeer Road, extending from south of the Abu Hamour Street junction to south of Al Waab Street.

Key highlights include two new grade-separated interchanges at Abu Hamour Street, featuring a 900-meter elevated bridge and MSE embankment, as well as a new two-level interchange at Haloul Street.

A third-level overpass at the Salwa Road interchange adds a 1,200-meter elevated structure, dramatically improving traffic flow. Notably, the project introduces Qatar’s first cable-stayed bridge, engineered to accommodate over 16,000 vehicles per hour. These upgrades are set to significantly reduce congestion, enhance connectivity, and support the nation’s ongoing economic growth and urban development.

LOCATION

Qatar

CLIENT

Public Works Authority (ASHGHAL)

SCOPE

Engineering, Construction

COMPLETION

November 2025

4 km

of Upgraded Dual Carriageway

Qatar’s 1st Cable-Stayed Bridge

Engineering Landmark

854 Precast Concrete Segments Used

Structural Bridge Deck Construction