3rd Generation Project (3 GP)
World’s Deepest Producing Oil Field in Kazakhstan
CCC played a pivotal role in delivering modularized construction excellence, with modules constructed both at Kazakh coastal fabrication yards, and at other fabrication yards worldwide, and “stick built” mechanical, steel structure, piping, electrical, and instrumentation elements.
Over 4,500 tons of modules were constructed and transported by CCC, combining global fabrication with local “stick-built” mechanical, structural, piping, electrical, and instrumentation works.
Beyond engineering, CCC championed local value creation—employing over 19,500 Kazakhstani nationals, who made up more than 97% of the total workforce. Through strategic recruitment, local procurement, and knowledge transfer, CCC strengthened regional supply chains and empowered national engineering capabilities. This commitment to sustainability and upskilling has left a lasting legacy of economic growth and technical excellence across Kazakhstan.
LOCATION
Kazakhstan
CLIENT
Tengizchevroil LLP (TCO)
SCOPE
Construction, Commissioning Assistance
COMPLETION
September 2023
Capacity Impact
Raise TCO’s Total Annual Crude Output to ~40 Million Tonnes
97% of Workforce
Held by Locals
100,000 + Hours
Skilled Training Delivered