Sustainability Report 2016 - page 32

Consolidated Contractors Group S.A.L. | Sustainability Report
30
ENVIRONMENT
Waste Management
The amount of construction waste we produce
is directly linked to the number of buildings and
infrastructure construction sites we manage.
The more work we carry out, the more waste is
produced. In 2015 we set a target that 20% of our
construction waste should be diverted away from
ending up in a landfill.
We aim to manage waste on our sites in the most
efficient way by encouraging reusing and recycling
of materials on-site and maximising segregation
throughout site waste management plans. By
recycling and recovery we monitor and report
the waste generated on each project and the
quantity diverted from the landfill. Each of our
sites has a waste champion and our environmental
managers regularly visit sites to audit operations
and ensure the implementation of procedures that
aim to minimise the environmental impact of our
operations.
A number of our projects have achieved notable
results on reusing construction materials (mainly
concrete, timber steel, rebar and so on).
PROJECT NAME
% of Construction
Materials Recycled
Midfield Terminal
Building (UAE)
96%
Batinah 6 Highway
(Oman)
90%
Dukhan Highway
Project (UAE)
54%
Wasit Gas Field
Development (KSA)
40%
Development of
Muscat International
Airport (Oman)
34%
CCC is committed to minimizing
construction waste throughout all our
operations.
CCC’s Waste Management Process
1.
Waste Segregation Separated into:
• Combustible solid waste
• Non-combustible solid waste
• Recyclable and reusable solid waste
• Hazardous Waste
2.
Waste Collection
3.
Waste Storage:
• Non-Hazardous waste
• Hazardous waste
4.
Waste Transport
5.
Waste Disposal
G4-EN23
1...,22,23,24,25,26,27,28,29,30,31 33,34,35,36,37,38,39,40,41,42,...112
Powered by FlippingBook