South Helwan 3x650 MW Thermal Power Plant
PROJECT NAME South Helwan Thermal Power Plant
LOCATION Helwan, Egypt
CLIENT Upper Egypt Electricity Production Company (UEEPC)
SCOPE Underground utilities, foundations and MEP works for buildings.
DURATION 52 Months
DATE OF COMPLETION March 2019

South Helwan 3x650 MW Thermal Power Plant

Design, fabrication, furnishing delivery to site, storing, installing, testing, startup, commissioning, maintaining until Taking Over and Acceptance Certification, preparation of detailed drawings and technical documents, as-built documents and placing in service of all civil, architectural works, associated systems and equipment including instruments and controls for the Helwan Power Station (CP-102).

Major buildings/structures are Site preparation and grading, underground utilities, three steam turbine generators, control building, furniture, one CAD station, three 152 m height chimneys, foundations for water pumps, transformers, pits and sumps, etc. and auxiliary facilities including intake, pump house, discharge, surge tanks, and circulating water building.

Project is expected to be one of the biggest thermal power plants (TPP) in Egypt, upon completion